Prospective Resources
This table is taken from the CPR. Please do not rely on this table, please refer to the full CPR.
MMboe Source: CPR November 2011 |
Prospective Resources |
GPoS (%) |
Gross (100% basis) and Net Attributable Resources |
P90 MMboe |
P50 MMboe |
P10 MMboe |
Mean MMboe |
P1368 |
Lancaster |
14 |
53 |
142 |
62 |
4.5% |
Whirlwind* |
17-19 |
80-90 |
215-261 |
101-119 |
25.0% |
Lincoln |
44 |
150 |
339 |
164 |
13.2% |
P1485, P1835 |
Typhoon |
16 |
149 |
1266 |
383 |
16.0% |
Total (Unrisked) if all successful |
|
|
|
710-728 |
|
Total (Risked) |
|
|
|
111-115 |
|
*Whirlwind range between gas condensate case and light oil case